LOUDWATER services and strategy

 

1. Feasibility study and business plan developmet 

Feasibility study will determine:

  • Identifying right locations - small streams and rivers from where corresponding volume of water is bypassed and lead by tubes into the small HPP. Also, drinking water reservoirs and water tanks can be used.
  • Legal conditions under which a power-generation business can operate in particular environment
  • Economics of electric energy production - purchase prices for 1kW of renewable electric energy production, costs, etc.
  • Environmental regulations for particular region where water streams are located.
  • Distance of HPP location from potential connection point to a public distribution network

 

2. Local partnership development

LOUDWATER is seeking to develop partnership with local investors, water management organizations or drinking water reservoirs. In mutual collaboration they would design HPP project and realize the power plant on the prospective location.

 

3. Small HPP project design, on-site development and construction

LOUDWATER hydropower projects design always respects environment and the local landscape and aquatic ecosystems. We work withyexperienced engineers and construction companies that meet and exceed the demanding EU standards on quality, safety and environment.

 

4. Small HPP operation and maintenance